Celebrate 2025 with Discount Offer - Coupon code:

US Green Building Council LEED-AP-BD+C Exam Dumps

Certification Exams

Downloadable PDF versions

100% Confidential

Updated Regularly

Advanced Features

Number Of Questions: 232

$59.00

Exam Details

Exam Name:

LEED AP Building Design + Construction (LEED AP BD+C)

Exam Code:

LEED-AP-BD+C

Total Questions in Exam:

232

Demo Questions

Q1. Which of the following is an example of a diverse use as defined by Location and Transportation Credit, Surrounding Density and Diverse Uses?

A.Automated Teller Machine (ATM)

B. Informal day care

C. Public park

D. Private university gym

Correct Answer: C

Q2. Which of the following statements are true for Erosion and Sedimentation Control (ESC) plan prerequisite compliance?

A.The ESC plan cannot be modified during the design phase of the LEED certification

B. The ESC plan can be developed or modified during the design phase of LEED certification

C. A compliant ESC plan may be developed during construction

D. A compliant ESC plan must be in place when the commissioning authority is appointed

Correct Answer: B

Q3. A project's massing and site orientation can have a direct impact on which of the following prerequisites?

A.Minimum Energy Performance

B. Minimum Indoor Air Quality Performance

C. Construction Activity Pollution Prevention

D. Fundamental Commissioning and Verification

Correct Answer: A

Q4. An office building design has demonstrated reductions in landscape water use of 30% over baseline and indoor water use of 40%. These reductions qualify the project for:

A.Four points for Water Efficiency Credit, Indoor Water Use Reduction

B. Zero points because the Water Efficiency Prerequisites are not met

C. One point for Water Efficiency Credit, Outdoor Water Use Reduction

D. One point for Water Efficiency Credit, Outdoor Water Use Reduction and four points for Water Efficiency Credit, Indoor Water Use Reduction

Correct Answer: D

Q5. Which of the following Building Product Disclosure and Optimization credits under the Materials and Resources category would a project team achieve by using insulation material that is cradle-to-cradle V3 Gold certified?

A.Material Ingredients, Option 2. Leadership Extraction Practices and Environmental Product Declarations, Option 1. Environmental Product Declarations (EPD)

B. Material Ingredients, Option 1. Material Ingredient Reporting and Material Ingredients, Option 2. Material Ingredient Optimization

C. Sourcing of Raw Materials, Option 1. Raw Material Source and Extraction Reporting and Material Ingredients, Option 2. Material Ingredient Optimization

D. Sourcing of Raw Materials, Option 2. Leadership Extraction Practices and Material Ingredients, Option 2. Material Ingredient Optimization

Correct Answer: B

$59.00

Reviews

There are no reviews yet.

Be the first to review “US Green Building Council LEED-AP-BD+C Exam Dumps”

Your email address will not be published. Required fields are marked *