Celebrate 2025 with Discount Offer - Coupon code:

SAP C_TS422_2022 Exam Dumps

Certification Exams

Downloadable PDF versions

100% Confidential

Updated Regularly

Advanced Features

Number Of Questions: 80

$59.00

Exam Details

Exam Name:

C_TS422_2022

Exam Code:

SAP Certified Associate - SAP S/4HANA Production Planning and Manufacturing

Total Questions in Exam:

80

Demo Questions

Q1. You can you use capacity availability checks for production orders, which settings have to be made for this? Note: There are 2 Correct answers to this question?

A.The relevant for finite scheduling indicator must be set.

B. A checking rule must be assigned to the work centers

C. An overall profile must be assigned in the checking control

D. An overall profile must be assigned in the checking control

Correct Answer: A, C

Q2. For a production version to be valid and consistent, what requirements must be fulfilled? Note: There are 3 correct answers to this question.

A.The deletion flag must NOT be set for the bill of material (BOM) or the routing

B. The lot size range must be within the lot size range of the assigned routing.

C. The assigned routing and bill of material (BOM) must be valid in the entirevalidity period.

D. The assigned routing must be a rate routing.

E. The assigned routing must NOT have alternative sequences

Correct Answer: A, B, C

Q3. You can you use capacity availability checks for production orders, which settings have to be made for this? Note: There are 2 Correct answers to this question?

A.The relevant for finite scheduling indicator must be set.

B. A checking rule must be assigned to the work centers

C. An overall profile must be assigned in the checking control

D. The scope of check must be defined in customizing.

Correct Answer: A, C

Q4. Which alternative item strategies are available in bills of material (BOMs) in SAP S/4HANA. Note: there are 2 correct answers to this question.

A.Manual maintenance

B. 100% check

C. First in First out (FIFO).

D. Simultaneous

Correct Answer: A, B

Q5. What are the consequences when you assign a planned order to a production line manually, using the planning table in repetitive manufacturing?

A.The planned order is converted to a production order.

B. The planned order's component availability is checked.

C. The planned order generates capacity requirements

D. The planned order's components are copied to the picking list.

Correct Answer: C

$59.00

Reviews

There are no reviews yet.

Be the first to review “SAP C_TS422_2022 Exam Dumps”

Your email address will not be published. Required fields are marked *